为了保证高潜水位矿区新建公路的路基路面不受地下水侵蚀,必须确保新建公路的路基路面标高大于潜水位。根据开采沉陷基本规律,通过对潜水位埋深和新建公路承载力之间关系的研究,提出了确定高潜水位矿区新建公路标高的一般性方法和潜水位控制措施。
In order to ensure pavement of new highway not to damage by groundwater in high groundwater mining,the elevation of new highway must be higher than the one of groundwater.With the basic law of mining subsidence,this paper puts forward the elevation calculation of new highway and measures of groundwater control in high groundwater mining by studying the relationship between the groundwater depth and the capacity of new highway.