技术站节省时间参数是货物列车编组计划优化的重要参数,既有研究主要都集中于单组列车,研究分组情形具有理论价值和现实意义。根据分组列车相对不同单组列车方案在途中换挂站的消耗分析,论文分别给出了相应的节省时间参数。节省时间参数的结果表明:相对无改编通过,分组列车部分改编作业额外增加了消耗时间;而相对完全改编,分组列车又存在节省。
As one of important optimization parameters for freight train formation plan(TFP), the existed reasearches on time-saving in a technical station have now centered on an one-block train(single group train).So that, research on the multi-block train situation is very significant in theoretical and practic value. According to the analysis on cost between multi-block train itinerary and one-block train with different operation modes, the corresponding results were presented respectively, which showed that there was an additional delay relative to the passing through train, but a net saving relative to the complete resorting train(break-up and make-up).