从土体本构关系出发,严格证明了在线性加载或近似线性加载情况下(这和岩土工程实际加载相类似),沉降-时间曲线呈“S”型,并由此建立了新的沉降-时间预测模型,工程应用证明了该模型的合理性。
Based on stress-strain relationship of soil, the proof is made for that s-t curve appears “S” shape when the load is increased linearly, which is similar to construction process. A new model of forecasting the relation of settlement-time is presented. Case history shows the rationality of the method.