建立了飞云江口二维潮流泥沙数学模型.模型经验证后,计算分析了凤凰山深水港区两个规划方案下的水流变化及泥沙回淤强度.计算结果表明,方案2的回流范围和泥沙回淤强度均小于方案1.
The 2-D tidal current and sediment mathematical model for Feiyunjiang estuary is established. After verification, the model is applied to calculate the change of current and back silting in the port area of Fenghuangshan Port with two different plans. Calculation results show that the recirculating region and back silting of Plan 2 are smaller than those of Plan 1.