在经济优化分析中,综合考虑影响矿山产量分配的主要约束,运用模糊预测原理对历史数据进行模糊化、归纳、总结、优化,建立模糊时间序列预测模型,利用模糊约束条件建立模糊目标规划模型,对矿山产能进行优化配置。对某公司下属的3个矿山2012、2013年产能配置进行了优化,结果表明,该模型是可靠的。
The main constraints of output allocation of mines were taken into account in economic optimization analysis. The historical data were fuzzed up, concluded, summed up and opti mized using fundamentals of fuzzy prediction. According to the predictive data and fuzzy constraint condition, fuzzy time series predictive model and fuzzy goal programming model were estab- lished, and applied to optimize the production capacity allocation of multi - mine. The production capacity allocation of three mines of a company in 2012, 2013 was optimized. And the results showed that the models are reliable.