本文对淮河梅山连拱坝9#、10#、11#垛及10#、11#两个全拱和9#、12#两个半拱用有限元数值计算方法,采用无质量弹性地基假定,并采用忽略库水可压缩性的动水压力附加质量的方法来表征库水的影响,计算分析加固前、后坝体动力特性的变化及结构的静动反应,重点考虑垛墙与拱上伸缩缝的影响。基于三维接触模型研究了伸缩缝的张开度及坝体变位情况,并确定坝体的高应力区范围。计算结果表明,加固后坝体在刚度及整体性能方面较加固前有所提高,但参考现行水工建筑物抗震设计规范的相关规定,尽管加固后坝体垛墙与拱上的最大主拉应力分布有所改变,拱与垛墙上局部仍存在拉应力较大的区域,需要采取进一步的加固措施。
Based on the hypothesis of the elastic massless foundation, the FEM is applied to analyze the effectiveness of reinforcement measure for improving the aseismic resistance of the Meishan Multiple Arch Dam, located in Huaihe River. The extra mass method in which the compressibility of water was ignored is adopted to characterize the effect of reservoir water. The dynamic characteristics and the static-dynamic response of the structure, especially the changes of the contraction joints on the buttresses and arc...