为解决XX地铁施工过程中车站与区间的配合问题,选取该站实际工程资料,运用Midas-GTS软件建立模型,模拟盾构区间与PBA车站配合施工过程中的不同施工方案,通过计算、分析、对比,得出最优施工方案,以确保车站结构及围护结构安全.
In order to solve the the problems of construction subway station and shield interval at XX subway station, the model is established by using the actual data and using Midas-GTS software to simulate the different construction projects of the subway station and shield interval construction process. Through calculation, analysis and comparision the best construction method is obtained to guarantee the subway station safety.