位置:成果数据库 > 期刊 > 期刊详情页
考虑海底增压的深水钻井当量循环密度预测方法
  • ISSN号:1000-7393
  • 期刊名称:《石油钻采工艺》
  • 时间:0
  • 分类:TE52[石油与天然气工程—油气田开发工程]
  • 作者机构:[1]中海油研究总院,北京100028, [2]中海石油(中国)有限公司深圳分公司,广东深圳518067
  • 相关基金:“十二五”国家科技重大专项课题“深水钻完井工程技术”资助(编号:2011ZX05026-001);国家自然科学基金“海洋深水浅层钻井关键技术基础理论研究”(编号:51434009).
中文摘要:

针对深水井筒ECD 预测与控制方面存在的不足,建立了考虑温度和岩屑影响及有海底增压管线举升系统情况下的深水钻井ECD 预测模型,以实例计算分析了深水钻井中有海底增压管线举升系统情况下ECD 变化.结果分析表明,钻柱内的排量一定时,增注排量越大,ECD 值越小;在有海底增压管线举升系统时,本计算条件下ECD 值均未超过漏失压力,因此该种参数工况下应该为安全状况;在无海底增压时,随着排量的降低,环空ECD 逐渐增加,且ECD 增加值较大;当排量小于一定值时,ECD 的增加会导致在钻井过程中的地层漏失.因此在深水钻井过程中应该特别注意在隔水管段的井眼清洁问题,除了控制机械钻速、泵入清扫液等措施以外,还应适量采取增加排量来及时清除钻屑,保持井眼清洁.最后对比分析了模型的有效性,在本计算条件下与PWD 实测值偏差最大1.36%,对深水钻井水力参数优化设计及井控具有一定的参考意义.

英文摘要:

Considering the shortcomings in ECD prediction and control of deepwater wellhole presently, the ECD prediction model of deepwater drilling has been established, with the temperature and rock debris effects are considered and the lift system of subsea pressurization pipeline is provided. The ECD changes are calculated and analyzed based on the living examples, when the lift system of subsea pressurization pipeline is provided in the deepwater drilling. According to the results, when the displacement in the drilling string is constant, the larger the augmented injection displacement, the smaller the ECD value; when the lift system of subsea pressurization pipeline is provided, the ECD value under such calculation conditions does not exceed the loss pressure, so it should be safe under such parameter conditions; when no subsea pressurization exists, as the displacement decreases, the annular ECD gradually increases, and the ECD added value is relatively greater; when the displacement is less than a constant value, the ECD increase will lead to the stratum loss during the drilling. Therefore, during the deepwater drilling, special attention should be paid to the borehole cleaning at the riser section. In addition to the control over mechanical drilling rate, pumping of cleaning lfuid and other measures, the displacement should be appropriately increased to clear the drilling cuttings in time, which is in order to keep the borehole clean. Finally, the model validity has been compared and analyzed. Under such calculation conditions, the maximum deviation from actually-measured value of PWD is 1.36%. This method has certain reference signiifcances for the optimization design of hydraulic parameter on deepwater drilling and well control.

同期刊论文项目
同项目期刊论文
期刊信息
  • 《石油钻采工艺》
  • 北大核心期刊(2011版)
  • 主管单位:中国石油天然气集团公司
  • 主办单位:华北油田分公司
  • 主编:董范
  • 地址:河北省任丘市华油采油工艺研究院
  • 邮编:062552
  • 邮箱:syzc@vip.163.com
  • 电话:0317-2782798 2723370
  • 国际标准刊号:ISSN:1000-7393
  • 国内统一刊号:ISSN:13-1072/TE
  • 邮发代号:18-121
  • 获奖情况:
  • 河北省优秀科技期刊奖,中国石油天然气集团公司优秀期刊
  • 国内外数据库收录:
  • 俄罗斯文摘杂志,美国化学文摘(网络版),荷兰文摘与引文数据库,美国剑桥科学文摘,日本日本科学技术振兴机构数据库,中国中国科技核心期刊,中国北大核心期刊(2004版),中国北大核心期刊(2008版),中国北大核心期刊(2011版),中国北大核心期刊(2014版),中国北大核心期刊(2000版)
  • 被引量:17544