促淤工程可以加强围区内泥沙淤积效果,加快成陆进程,减少后期的填方工程量,是降低工程造价及降低圈围大堤施工难度的有效方式。促淤工程是围海造地的一个重要环节,其促淤效果是重点关注的问题之一,对其进行分析研究非常必要。为研究钓梁围垦工程的促淤效果,对钓梁围垦已实施的促淤工程实际淤积效果进行统计分析,并利用分析结果对二、三期围垦工程区域的淤积进程进行预报,有助于其选取合理的施工时间。
As deposition promotion can intensify the sediment deposition effects in reclamation area, fasten the land formation process and decrease filling volume in late period, it is an effective way to reduce engineering costs and corrslruction difficulty of reclamation levees. Therefore, deposition promotion is a key part in sea reclamation. It is crucial to study the effects of deposition promotion. This paper studied the effects of deposition promotion for Diaoliang reclamation project by analyzing actual deposition effects for the first phase and predicting deposition process for the second and third phase. The results will be helpful in selecting a suitable construction time.