环境保护部《一般工业固体废物贮存、处置场污染控制标准》(GB18599-2001)等3项国家污染物控制标准修改单公告(公告2013年第36号)中指出:应依据环境影响评价结论确定场址的位置及其与周围人群的距离。尾矿库大气环境防护距离的计算,由于其特殊性,目前尚未形成共识。结合某尾矿库项目环评实例,根据尾矿库风洞实验确定尾矿库扬尘源强公式,根据尾矿库扬尘产生特性,对SCREEN3模型进行修正。结果表明:在保持尾矿砂一定含水率(湿度小于1%)及尾矿粒径组成(尾中砂和尾细砂〈30%)情况下,地面贡献浓度达标的距离不会大于1500m,折算到尾矿库坝基外侧,确定大气环境防护距离。
Environmental protection department " general industrial solid waste storage, disposal field pollution control standards" (GB18599-2001) and other 3 national pollutant control standards for the modification of the single announcement (Notice No. thirty-sixth) in 2013 show that:the location of tailing dam and the atmospheric environmental protection distance should be determined by environmental impact assessment. Because of its special nature ,there is not yet a consensus in calcu- lation on and methods of atmospheric environmental protection distance of railings. Combining with the environmental assess- ment on a tailing dam, and by means of wind tunnel test, the dust source strength formula of the tailings reservoir is deter- mined, and the calculation model of the SCREEN3 model is modified based on the characteristics of dust. Results show that ground concentration distance will be less than 1 500 meters when humidity of railings is less than 1% and ratio of tail sand and fine sand is less than 30% ,which are converted to the outside of the dam foundation to determine atmospheric environment and hygienic prevention distances.