位置:成果数据库 > 期刊 > 期刊详情页
Mechanism and experiment of substituting high drainage roadway with directional long drilling group to extract pressure-relief gas
  • ISSN号:1672-9102
  • 期刊名称:《湖南科技大学学报:自然科学版》
  • 时间:0
  • 分类:TD713.3[矿业工程—矿井通风与安全] X799.05[环境科学与工程—环境工程]
  • 作者机构:[1]College of Resources & Safety Engineering,China University of Mining and Technology (Beijing), Beijing 100083, China, [2]College of Mining Engineering, Taiyuan University of Technology, Taiyuan 030024, China
  • 相关基金:Project(50834005) supported by the National Natural Science Foundation of China; Project(2010QZ06) supported by the Fundamental Research Funds for the Central Universities of China
中文摘要:

By establishing the numerical model in the vertical plane and the similar model in the horizontal plane of gas flow in goaf,the influence of high drainage roadway or drilling on the gas seepage field was analyzed,and the extraction mechanism was clarified.On this basis,the academic thought of directional long drilling group instead of high drainage roadway was put forward.And then using complex function theory,the permeation mechanical model of drilling group with circle distribution in the mining-induced fracture zone was established to explore the coupling relationship between the drilling quantity,extraction volume and the equivalent extraction rate of single drilling.Finally,combined with the concrete geological production conditions,the main parameters of directional long drilling group were determined.The distance between the drilling group center and the air-return roadway is 24 m,the height is 18 m,and the three drillings are in an approximate equilateral triangle distribution with a space of 8 m.The equivalent extraction square is 4.15 m2.It is shown that the effect of directional long drilling group is evident.The gas content in the upper corner is controlled below 0.95%,the content in the tail roadway is kept below the alarm value,and the content is over 50% in the drill,realizing the secure and effective extraction of coal and gas.

英文摘要:

By establishing the numerical model in the vertical plane and the similar model in the horizontal plane of gas flow in goaf, the influence of high drainage roadway or drilling on the gas seepage field was analyzed, and the extraction mechanism was clarified. On this basis, the academic thought of directional long drilling group instead of high drainage roadway was put forward. And then using complex function theory, the permeation mechanical model of drilling group with circle distribution in the mining-induced fracture zone was established to explore the coupling relationship between the drilling quantity, extraction volume and the equivalent extraction rate of single drilling. Finally, combined with the concrete geological production conditions, the main parameters of directional long drilling group were determined. The distance between the drilling group center and the air-return roadway is 24 m, the height is 18 m, and the three drillings are in an approximate equilateral triangle distribution with a space of 8 m. The equivalent extraction square is 4.15 m2. It is shown that the effect of directional long drilling group is evident. The gas content in the upper comer is controlled below 0.95%, the content in the tail roadway is kept below the alarm value, and the content is over 50% in the drill, realizing the secure and effective extraction of coal and gas.

同期刊论文项目
期刊论文 138 会议论文 18 获奖 16 专利 3 著作 2
同项目期刊论文
期刊信息
  • 《湖南科技大学学报:自然科学版》
  • 中国科技核心期刊
  • 主管单位:湖南省教育厅
  • 主办单位:湖南科技大学
  • 主编:曹晨忠
  • 地址:湖南湘潭市湖南科技大学期刊社
  • 邮编:411201
  • 邮箱:xuebaoz@hnust.edu.cn,xuebaoz@hnust.edu.cn
  • 电话:0731-58290354 8290272
  • 国际标准刊号:ISSN:1672-9102
  • 国内统一刊号:ISSN:43-1443/N
  • 邮发代号:42-227
  • 获奖情况:
  • 中国核心期刊,教育部二等奖国外数据库收录:IE
  • 国内外数据库收录:
  • 美国化学文摘(网络版),中国中国科技核心期刊,中国北大核心期刊(2004版),中国北大核心期刊(2008版),中国北大核心期刊(2011版),中国北大核心期刊(2014版)
  • 被引量:3756