任务投放的任务挑选问题是负荷控制理论中任务投放策略的关键问题之一。针对模具车间任务投放选择问题.提出了一种在等周期条件下基于瓶颈资源所确定任务投放上界,采用0—1整数规划模型挑选任务的启发式算法.并通过仿真实验加以验证。
The job selection of job release is one of the most important parameters of the release strategy in workload control concept (WLC) . As for the problem about job selection of periodical job release to mould workshop, this paper proposes a way to the formulation of the problem based on bottleneck resources, jobs can be selected by 0-1 integer programming model, and simulation results have shown that the presented method is reasonable and efficient.