土方量的计算方法有方格网法、断面法、等高线法及基于DEM的计算方法等。为计算高阜工业园区的土方量,采用方格网法;并重点讨论在不同地形坡度下,得到的不同土方量计算结果;最后根据测区需要,做出合理选择。
There are some different methods for earthwork calculation, such as square grid, section, contour, DEM method, and so on. This paper has applied the square grid method to deal with the calculation of earthwork for Gaofu Industry Area. Different terrain slope is discussed mainly in this paper to obtain different results. The reasonable choice can be made according to Gaofu Industry Area.