位置:成果数据库 > 期刊 > 期刊详情页
邻轨PS-InSAR地面沉降结果拼接处理方法与实验
  • ISSN号:1560-8999
  • 期刊名称:地球信息科学学报
  • 时间:2014
  • 页码:797-805
  • 分类:TU433[建筑科学—岩土工程;建筑科学—土工工程]
  • 作者机构:[1]北京大学遥感与地理信息系统研究所,北京100871
  • 相关基金:国家自然科学基金项目(41171267);中国科技部一欧洲空间局合作“龙计划”l一期项目(10665).
  • 相关项目:基于WRF模式系统的InSAR大气校正方法研究
中文摘要:

目前,我国许多经济发达地区都面临着地面沉降灾害的困扰,沉降范围扩大,程度日益加剧,逐渐成为城市发展中亟待解决的问题。永久散射体合成孔径雷达干涉测量(Persist entScatterer Interferometric Synthetic Aperture Radar,PS-InShR)作为地表形变测量的主要手段之一,在地面沉降监测中发挥着重要作用。而单轨星载SAR影像成像幅宽有限,在开展大范围地面沉降调查时需要将多轨道PS—InSAR沉降速率图进行拼接。本文重点讨论了入射角效应和参考点差异对PS—InSAR沉降结果的影响,分析了相邻轨道PS.InSAR沉降速率拼接中存在的PS点位置差异和沉降量偏移,鉴此,提出了采用区块法和插值法对异轨重叠区的形变结果求差的思路,以及基于现有软件PS-InSAR地面沉降速率的跨轨拼接处理流程,利用广东珠三角地区ENVISATASAR数据进行了实验分析。结果表明,相邻轨道入射角不同会造成沉降量的差异,在多轨道情况下对沉降量影响增大,因此,在拼接过程中需要进行入射角纠正。本文提出的区块法和插值法能有效地求解异轨重叠区的形变差,结果表明区块法优于插值法;相邻轨道参考点差异会造成沉降量偏移,通过区块法或插值法求差可以消除该偏移量。本文提出的拼接流程可将多轨道PS—InSAR地面沉降速率统一到同一基准下,从而获得大范围一致的地面沉降速率。

英文摘要:

At present, more and more economic developed areas are facing serious land subsidence problems with increasing coverage and intensity, which prevents the application of sustainable development in these areas. Thus, the land subsidence problems should be controlled urgently. PS-InSAR technology, as one of the most important tools to detect land subsidence, has played a significant role in land subsidence monitoring. However, multi-track PS-InSAR results must be connected to obtain the large scale subsidence map when an extended land subsidence survey area is required, since spaceborne SAR image from only one track is too limited in scan range to cover the whole area. This paper analyzes the processing chain of PS-InSAR and points out two key problems when connecting multi-track PS-InSAR results from adjacent tracks. First, many PS from adjacent tracks are physically different, which is mainly caused by different incidence angles and coherences of adjacent tracks. Therefore, it is hard to find the tie point in the overlapped area. Second, there is a subsidence offset between two adjacent tracks according to the overlapped area, which is attributed to the physical differences of PS and the pro- cessing parameters of PS-InSAR, such as the reference point, the temporal coverage and so on. Among these factors, impacts caused by different incidence angles and reference offset are emphasized. Two new methods, Block Method and Interpolation Method, are proposed in this paper to calculate the differences between subsidence velocities from adjacent tracks caused by the physical differences of PS in the overlapped area. This can avoid the difficulty of finding tie point in the overlapped area. Moreover, subsidence velocities are adjusted to mitigate the impacts from different incidence angles. Finally, based on the existing software, a complete procedure for multitrack PS-InSAR subsidence results connection is demonstrated. At the end of this paper, ENVISAT ASAR datas- ets of Pearl Delta River in Guangdong province are proce

同期刊论文项目
期刊论文 30 会议论文 17 获奖 3
同项目期刊论文
期刊信息
  • 《地球信息科学学报》
  • 中国科技核心期刊
  • 主管单位:中国科学院
  • 主办单位:中国科学院地理科学与资源研究所 中国地理学会
  • 主编:徐冠华
  • 地址:北京大屯路甲11号
  • 邮编:100101
  • 邮箱:sxfu@lreis.ac.cn
  • 电话:010-64888891
  • 国际标准刊号:ISSN:1560-8999
  • 国内统一刊号:ISSN:11-5809/P
  • 邮发代号:82-919
  • 获奖情况:
  • 国内外数据库收录:
  • 中国中国科技核心期刊,中国北大核心期刊(2008版),中国北大核心期刊(2011版),中国北大核心期刊(2014版)
  • 被引量:3181