炼油企业生产计划是一种递阶的运作模式。在制定炼油生产计划的时候,首先根据市场需求以及现有生产环境来确定一个目标炼油计划,然后再根据这个目标炼油计划得出一个详细炼油计划。然而,这个详细炼油计划只是记录了相关的输油管道的信息,但没有给出输油顺序,针对此情况,根据详细生产计划得出输油管道的输油顺序,并计算出每次输送原油的体积。
Refinery production planning is a hierarchical mode of operation. In the development of oil refining production plan,according to market demand and existing production environment to identify a target refining plans, and then based on this goal refinery plan a detailed refining plans. However, the detailed refinery plan is recorded in the pipeline, but did not give the order of oil, oil pipeline order,and each time the volume of transportation of crude oil this article is based on a detailed production plan.