多肋火灾下混凝土T形梁桥实体剪力滞比研究
  • ISSN号:1003-4722
  • 期刊名称:《桥梁建设》
  • 时间:0
  • 分类:U448.212[建筑科学—桥梁与隧道工程;交通运输工程—道路与铁道工程]
  • 作者机构:[1]长安大学公路学院,陕西西安710064, [2]长安大学工程机械学院,陕西西安710064, [3]浙江工业大学建筑规划设计研究院,浙江杭州310014
  • 相关基金:国家自然科学基金项目(51308056);国家交通运输部建设科技项目(2011812318970);中央高校基本科研业务费专项资金资助项目(2014G2210003,2013G2211004)
中文摘要:

为研究多肋火灾下混凝土T形梁桥的剪力滞变化规律,以横桥向5片T形梁组成的混凝土简支梁桥为背景进行分析。采用ANSYS建立混凝土T形梁桥多肋火灾模型,分析多梁肋在对称火荷载作用下,混凝土T形梁桥实体剪力滞比的变化特征。结果表明:所有梁肋受火时,随火温持续时间的延增,剪力滞比呈指数曲线趋势逐渐增加,且处于负剪力滞分布状态;单侧半跨5片梁肋受火,火温持续时间在20min内时,剪力滞比变化明显,火温持续时间在20~60min时,剪力滞比基本回至初值,且随火温持续时间的延增,剪力滞比时程曲线逐渐向初始状态靠拢,走势平坦;桥跨方向非连续梁肋受火,近火梁肋剪力滞比显著。

英文摘要:

To study the varying laws of the shear lag of the concrete T-girder bridge with its multiple girder ribs exposed to fire, a concrete simply-supported girder bridge comprised of 5 Tgirders in the transverse direction of the bridge was cited as an example and was analyzed. The software ANSYS was used to build up the models of the T-girder bridge with its multiple girder ribs exposed to fire and the varying features of the solid shear lag ratios of the bridge under the action that the girder ribs were subjected to the symmetric fire load were analyzed. The results of the analysis show that when all the girder ribs of the bridge are exposed to fire, with the exten- sion of the fire temperature duration, the shear lag ratios present the tendency of gradually in- creasing in the exponential curves and are in the state of negative shear lag distribution. When the 5 girder ribs of half a span on one side are exposed to fire and the fire temperature duration is within 20 min, the varying of the shear lag ratios is significant. When the fire temperature dura- tion is within 20~60 min, the shear lag ratios basically come back to their initial values and with the extension of the fire temperature duration, the time-history curves of the shear lag ratios gradually approach their initial state and the varying of the curves is fiat. For the discontinuous girder ribs along the bridge spans exposed to fire, the varying of the shear lag ratios of the girder ribs closed to fire is significant.

同期刊论文项目
同项目期刊论文
期刊信息
  • 《桥梁建设》
  • 北大核心期刊(2011版)
  • 主管单位:中国铁路工程总公司
  • 主办单位:中铁大桥局集团有限公司
  • 主编:胡贵琼
  • 地址:武汉市建设大道103号
  • 邮编:430034
  • 邮箱:qlkxyjs@public.wh.hb.cn
  • 电话:027-83519506
  • 国际标准刊号:ISSN:1003-4722
  • 国内统一刊号:ISSN:42-1191/U
  • 邮发代号:38-54
  • 获奖情况:
  • 《CAJ-CD规范》执行优秀期刊
  • 国内外数据库收录:
  • 俄罗斯文摘杂志,波兰哥白尼索引,荷兰文摘与引文数据库,美国工程索引,美国剑桥科学文摘,中国中国科技核心期刊,中国北大核心期刊(2004版),中国北大核心期刊(2008版),中国北大核心期刊(2011版),中国北大核心期刊(2014版),中国北大核心期刊(2000版)
  • 被引量:10953