基于双重优化GM(1.1)模型的MC多项目进度预测研究
  • ISSN号:1671-1815
  • 期刊名称:《科学技术与工程》
  • 时间:0
  • 分类:F406.2[经济管理—产业经济]
  • 作者机构:[1]湖南大学工商管理学院,长沙410082
  • 相关基金:国家自然科学基金项目(70671037)资助
中文摘要:

在大规模定制(Mass Customization)企业多项目进度预测进行分析,并对项目进度预测方法进行比较的基础上,指出适合MC企业多项目进度预测的灰色动态预测方法。通过对GM(1.1)动态预测模型构建中的两个方面进行改进,使改进后的模型预测精确度更高,适用范围更广。然后根据MC企业多项目进度的实例应用及模型检验,对传统模型与改进后的模型进行比较,最后得出结论。

英文摘要:

Multi-project schedule forecasting of mass customization (MC) enterprises were analyzed and project schedule forecasting methods were compared. Grey dynamic forecasting method was pointed out, which is suitable for multi-project schedule forecasting of MC enterprises on the basis. For higher forecast accuracy and wider application, two aspects were improved in the structure of GM ( 1.1 ) dynamic forecasting method. Then according to example of MC enterprise' s multi-project schedule application and model testing, conclusion is given by the comparison between traditional model and improved model.

同期刊论文项目
同项目期刊论文
期刊信息
  • 《科学技术与工程》
  • 北大核心期刊(2011版)
  • 主管单位:中国科学技术协会
  • 主办单位:中国技术经济学会
  • 主编:明廷华
  • 地址:北京市学院南路86号
  • 邮编:100081
  • 邮箱:ste@periodicals.net.cn
  • 电话:010-62118920
  • 国际标准刊号:ISSN:1671-1815
  • 国内统一刊号:ISSN:11-4688/T
  • 邮发代号:2-734
  • 获奖情况:
  • 国内外数据库收录:
  • 中国中国科技核心期刊,中国北大核心期刊(2011版),中国北大核心期刊(2014版)
  • 被引量:29478