位置:成果数据库 > 期刊 > 期刊详情页
单可变资源最小化加权完工时间和排序问题的强NP-困难性
  • ISSN号:1007-6093
  • 期刊名称:《运筹学学报》
  • 时间:0
  • 分类:O223[理学—运筹学与控制论;理学—数学]
  • 作者机构:[1]郑州大学数学系,郑州450052, [2]中国计量学院数学系,杭州310018
  • 相关基金:The first author was supported by NSFC (10971201), NSFC-RGC (70731160633) and SRFDP (20070459002), and the second author was supported by NSFC (10601051) and Zhejiang Provincial Natural Science Foundation of China (No. Y6090472).
中文摘要:

Baker和Nuttle提出了下述单可变资源排序问题:扎个工件利用某个单资源进行加工使得工件的完工时间的某个函数达到最小,而资源的可利用率是随着时间而变化的.当最小化的目标函数是工件的加权完工时间和时,Baker和Nuttle猜测该问题是NP-困难的.最近,Yuan、Cheng和Ng证明该问题在一般意义下是NP-困难的,但是问题的精确复杂性仍然是悬而未决的.本文我们证明了该问题是强NP-困难的.

英文摘要:

Baker and Nuttle studied the following single-variable-resource scheduling problem: sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. When the objective function to be minimized is the total weighted completion time, Baker and Nuttle conjectured that the problem is NP-hard. Recently, Yuan, Cheng and Ng showed that this problem is NP-hard in the binary sense, but the exact complexity of the problem is still open. We show in this paper that this problem is strongly NP-hard.

同期刊论文项目
同项目期刊论文
期刊信息
  • 《运筹学学报》
  • 中国科技核心期刊
  • 主管单位:中国科学技术协会
  • 主办单位:中国运筹学会
  • 主编:胡旭东
  • 地址:上海市上大路99号上海大学期刊社
  • 邮编:200444
  • 邮箱:ort@mail.shu.edu.cn
  • 电话:021-66137605
  • 国际标准刊号:ISSN:1007-6093
  • 国内统一刊号:ISSN:31-1732/O1
  • 邮发代号:4-777
  • 获奖情况:
  • 国内外数据库收录:
  • 美国数学评论(网络版),德国数学文摘,日本日本科学技术振兴机构数据库,中国中国科技核心期刊,中国北大核心期刊(2004版),中国北大核心期刊(2011版),中国北大核心期刊(2014版)
  • 被引量:1362