欢迎您!
东篱公司
退出
申报数据库
申报指南
立项数据库
成果数据库
期刊论文
会议论文
著 作
专 利
项目获奖数据库
位置:
成果数据库
>
期刊
> 期刊详情页
Competitive Analysis of a New Semi-online Algorithm to Minimize Total Completion Time with Next Rele
时间:0
相关项目:基于离散事件系统控制理论的预测调度算法研究
同期刊论文项目
基于离散事件系统控制理论的预测调度算法研究
期刊论文 36
会议论文 4
同项目期刊论文
有界扰动系统高效鲁棒预测控制器设计
单步预测的单机调度算法及其性能分析
用蚁群算法求解Job Shop问题的机器分解方法
A fictitious play approach for minimizing the total weighted tardiness in a job shop
Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
工件到达时间未知的动态Job shop滚动重调度
Flocking of Multi-Agent Dynamic Systems with Guaranteed Group Connectivity
基于参数李亚普诺夫函数的鲁棒预测控制器
基于博弈模型的多智能体覆盖控制问题
求解Pareto边界的并行多目标遗传邻域搜索算法
加工时间不确定的Just-in-Time单机鲁棒调度
Constrained robust feedback model predictive control for uncertain systems with polytopic descriptio
预测控制拟等效集结的仿真研究
城市交通网络宏观控制模型及仿真实现
有界扰动系统高效鲁棒预测控制器设计方法
Sewage Flow Optimization Algorithm for Large-scale Urban Sewer Networks Based on Network Community D
Adaptive Stabilization and Trajectory Tracking of Airship with Neutral Buoyancy
Comment on "Competitive analysis of a better online algorithm to minimize total completion time on a
An Online Algorithm and Its Competitive Analysis for a Single Machine Scheduling Problem with Bounde
An Optimal Online Algorithm for a Single Machine Scheduling Problem with Bounded Processing Time
Lyapunov-based boundary feedback control in multi-reach canals
A Novel Way to Analyze Competitive Performance of Online Algorithms
预测调度算法在平行机问题中的应用
Performance Analysis of Active Schedules in Identical Parallel Machines,
Quality guaranteed aggregation strategy in model predictive control
Aggregation based robust model predictive controller for systems with bounded disturbance
A near-optimal semi-online algorithm for maximizing throughput scheduling problem
Design of Robust Model Predictive Control Based on Multi-step Control Set
Sewage flow optimization algorithm for large-scale urban sewer networks based on network community division
用蚁群算法求解Job-Shop问题的机器分解方法
基于自组织映射神经网络的多目标调度研究
折扣加权总完工时间问题的半在线排序算法
工件到达时间未知的动态车间滚动重调度
Performance analysis of active schedules in identical parallel machine