介绍了两种独立的调度方法——投产序列规划和工位任务规划;系统论述了开式柔性混装线中,对于给定节拍协同调度投产序列和工位的意义;用实际事例和具体数据递进演示证明了协同调度的效果.
Two different methods of scheduling, sequencing planning and workstation planning, are introduced in the paper. The method and principle of synergistic planning of sequencing and workstation in open flexible mixed model assembly line are systematically described, and the result of cooperative scheduling is demonstrated with examples and data.