井下施工条件优劣是开展槽波地震勘探的先决条件,目前对井下施工条件的评价尚没有明确的技术指标和理论依据。针对槽波地震勘探施工条件评价过程中存在的模糊性,应用模糊综合评判法进行综合分析,并据此实际评价出了工作面的施工条件等级。评价结果客观、科学、合理,可为施工设计和后期资料处理解释提供必要的理论依据,达到优化施工流程、提高数据采集质量的目的。
Underground construction is a prerequisite condition to carry out the pros and cons trough channel wave seismic prospecting. The current condition of the underground construction is still no clear evaluation of the technical indicators and theoretical basis. The fuzzy comprehensive evaluation method analyzed the problem comprehensively which exists the process of channel wave seismic prospecting construction condition the assessment tasks evaluation, and provides a certain level according to the actual evaluation of construction conditions. The assessment result is objective, scientific and reasonable. Furthermore, it can provide the necessary theoretical basis for the design and construction of post-data processing and interpretation, optimize the construction Precess and improve the aualitv of data collection.