运用模糊水文水资源学中成因分析、统计分析、模糊集分析相结合的基本方法,依据雨洪资料,对河南白龟山水库汛期进行模糊集分析和洪水资源利用研究。在不降低水库防洪标准前提下,对水库汛期汛限水位进行动态控制,即水库主汛期以原设计汛限水位迎洪,8月中旬始可在1.0 m范围内上浮汛限水位,水库年均工业与民用供水量比原设计的增加24%。
Fuzzy set analysis and the utilization methods of flood resources in the Baiguishan Reservoir during the flood season are presented based on rainfall data using the cause analysis, the probability analysis and the fuzzy set analysis methods in fuzzy hydrology. On ensuring the standard for flood control of the reservoir, the flood control water level of the Baiguishan Reservoir can be regulated dynamically: the design flood control water level is used in main flood seasons, while the flood control water level can be raised within a range of 1.0 m from the middle of August. Thus, the mean annual industrial and domestic water supply can be 24% higher than the design value.