电力网架建设过程中,电压等级潮流断面输电能力瓶颈问题日益凸显,特高压输电容量无法得到充分利用。有效的方法是在潮流断面安装移相器改善优化输电能力。提出一种多电压等级输电通道潮流综合评价方法.分析评价不同地点安装移相器的方案优化能力,得到利用移相器改善多电压等级潮流断面的最优方案。在进行实际电网中进行仿真分析。仿真结果大幅度提高了潮流断面输电能力。
In the process of power grid construction, the problem of the transmission capacity bottleneck of voltage grade power flow is becoming more and more prominent, and the special high-voltage transmission capacity can't be fully utilized. Effective method is to improve the transmission capacity of the power flow section of the power flow section. Put forward a comprehensive evaluation method of multi voltage level of transmission channel flow, analysis and evaluation of different locations for the installation of phase shifter scheme optimization and uses the phase shifter to improve the optimal solution of the multi voltage grade power flow section. Simulation analysis of actual power grid. The simulation results can greatly improve the transmission capability of the power flow and can guide the installation position of the actual phase shifter, and have some guidance to the actual power network reconstruction and operation.