对某水利枢纽工程碾压混凝土温度监测资料进行了分析,找出了该水电站典型碾压混凝土溢流坝段测点处温度的变化规律与坝体温度场的分布规律。并对该电站同时在常态和碾压两种不同性态的混凝土施工期的不同温度特性进行了对比分析。
This paper simply introduces a hydro-junction project and analyses its temperature monitoring data, from which the law of thermometer measuring point's temperature change and the law of its field distribution in this typical rolled compacted concrete overflow dam section of the hydropower station are presented, In view of the fact that the station has installed thermometers in normal and rolled concrete, therefore contrastively analyse the differentd thermal characteristics of these two kinds of concrete during construction.